Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Senderbahn I





Valley Station
Valley Station

Valley Station
Valley Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Bad Gastein
resort Ski amadé
Region Salzburg
Country AT Austria, Österreich
Name of lift Senderbahn I 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2008 
Commissioning date ??

geometric data  
Height of valley station 1179,0 m
Height of mountain station 1387,51 m
Vertical rise 208,50 m
Route distance 758,90 m
Horizontal length 729,70 m
Average incline 28,57 %
Largest incline ?? %
Number of pillars 5 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2401 Pers/h
Travel time 2,22 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive ?? Stk
Drive power (Start) 373 kW
Drive power (Operation) 313 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type A108C
Cab manufacturer CWA
Cab model OMEGA IV-8 LWI
Seating leather
Seat heater yes
Heater no
Aircon no
Persons per cab
Number of cabs 32 Stk
Cab distance 71,97 m
Cab interval 11,99 s
Garage type ground floor
Garage place Middle station(s)
Garage direction forward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs 12,700,000  EUR 
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 03/05/21 08:58:55
PHOTOS: 31/01/10 09:26:00

Lift-Statistics
15585 visit(s) since 01/11/08
Last visit 13/06/21

LIFT-WORLD IDs
Lift-ID: 13258
Place-ID: 246

https://www.seilbahntechnik.net/en/lifts/13258/datas.htm