Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD SkiWeltbahn












Infos for handicapped persons
Sorry, no information available.

Characteristics
This lift crosses a railtrack

General information  
Place Brixen im Thale
resort SkiWelt
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift SkiWeltbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2008 
Commissioning date ??

geometric data  
Height of valley station 794 m
Height of mountain station 1820 m
Vertical rise 1007 m
Route distance 3407 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 12 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Austria Draht 
Length of haul rope 7116 m
Total weight of haul rope 96 t
Haul rope diameter 56 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 1200 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA IV-8 LWI
Seating leather
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 96 Stk
Cab distance ?? m
Cab interval 13 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) 11 




This information are for members only visible!



Updates
Datas: 06/05/15 18:17:43
PHOTOS: 04/01/09 21:45:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
17168 visit(s) since 01/11/08
Last visit 20/10/19

LIFT-WORLD IDs
Lift-ID: 13260
Place-ID: 73

https://www.seilbahntechnik.net/en/lifts/13260/datas.htm