Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Karlesjochbahn


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Feichten
resort Kaunertaler Gletscher
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Karlesjochbahn 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2008 
Commissioning date ??

geometric data  
Height of valley station 2752 m
Height of mountain station 3107 m
Vertical rise 355 m
Route distance 1617 m
Horizontal length 1571 m
Average incline 21,87 %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1660 (2142) Pers/h
Travel time 4,6 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope 3297,11 m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 451 kW
Drive power (Operation) 396 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Sigma
Cab model ??
Seating leather
Seat heater yes
Heater ??
Aircon ??
Persons per cab
Number of cabs 38 (49) Stk
Cab distance 104,10 (80,68) m
Cab interval 17,35 (13,35) s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 13/04/14 12:22:00
PHOTOS: 22/05/09 10:35:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
19729 visit(s) since 01/11/08
Last visit 16/09/19

LIFT-WORLD IDs
Lift-ID: 13264
Place-ID: 222

https://www.seilbahntechnik.net/en/lifts/13264/datas.htm