Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Choralmbahn


Line
Line

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Westendorf
resort SkiWelt
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Choralmbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2008 
Commissioning date ??

geometric data  
Height of valley station 929 m
Height of mountain station 1820 m
Vertical rise 891 m
Route distance 2365 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 7 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 106
Cab manufacturer CWA
Cab model OMEGA IV-8 LWI
Seating leather
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 71 Stk
Cab distance ?? m
Cab interval 13 s
Garage type ??
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) 112 




This information are for members only visible!



Updates
Datas: 06/05/15 20:34:44
PHOTOS: 27/01/14 21:53:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
16222 visit(s) since 01/11/08
Last visit 26/08/19

LIFT-WORLD IDs
Lift-ID: 13287
Place-ID: 72

https://www.seilbahntechnik.net/en/lifts/13287/datas.htm