Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Velillbahn







Valley station
Valley station

General information  
Place Ischgl 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Velillbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1995 
Commissioning date 1995 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2321 m
Height of mountain station 2602 m
Vertical rise 281 m
Route distance 1464 m
Horizontal length ?? m
Average incline 19,6 %
Largest incline 41,7 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 4,88 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 670 kW
Drive power (Operation) 470 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 106 
Cab manufacturer Doppelmayr 
Cab model 6E95/B 
Bubble colour neutral 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 87 Stk
Cab distance 36 m
Cab interval 7,2 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 44 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) B1 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/04/23
PHOTOS: ??

Lift-Statistics
19873 visit(s) since 10/12/02
Last visit 18/03/24

LIFT-WORLD IDs
Lift-ID: 136
Place-ID: 2

https://www.seilbahntechnik.net/en/lifts/136/datas.htm