Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Schönbühelbahn

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Lofer 
resort ?? 
Region Salzburg 
Country   
Name of lift Schönbühelbahn 
Type 4-CLF 
Lift manufacturer SSG 
Year of construction 1990 
Commissioning date ?? 
Date of closing down 2019 
Date of pull down 2019 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1355 m
Height of mountain station 1628 m
Vertical rise 273 m
Route distance 1143 m
Horizontal length ?? m
Average incline 24,80 %
Largest incline 38,70 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 7,6 min
Driving speed line 2,4 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer SSG 
Cab model 4E98/A 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 135 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 3 months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 15/08/23
PHOTOS: ??

Lift-Statistics
13690 visit(s) since 02/09/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 1361
Place-ID: 217

https://www.seilbahntechnik.net/en/lifts/1361/datas.htm