Lift-Database » Lifts in the world

  6-MGD Tougnète 1

Valley Station
Valley Station

Line
Line

Line
Line

General information  
Place Meribel 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Tougnète 1 
Type 6-MGD 
Lift manufacturer Poma 
Year of construction 2008 
Commissioning date 2008 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Same stations and pileres like the old Tougnette 1.

geometric data  
Height of valley station 1439 m
Height of middle station(s) ?? m
Height of mountain station 1919 m
Vertical rise 474 m
Route distance 1649 m
Horizontal length ?? m
Average incline 31 %
Largest incline 59 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 5,4 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 355 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type Omega T 
Cab manufacturer Sigma 
Cab model ?? 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 54 Stk
Cab distance 54 m
Cab interval 10,8 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29/01/22
PHOTOS: ??