Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Sonnenkar I












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Kaprun
resort Kitzsteinhorn
Maiskogel
Region Salzburg
Country AT Austria, Österreich
Name of lift Sonnenkar I 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1997 
Commissioning date 1997

geometric data  
Height of valley station 2415 m
Height of mountain station 2672 m
Vertical rise 257 m
Route distance 759 m
Horizontal length 705 m
Average incline 36,67 %
Largest incline 73,50 %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 2,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope 1575 m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 396 kW
Drive power (Operation) 316 kW
Brake power -256 kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model ??
Bubble colour neutral
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 48 Stk
Cab distance 36 m
Cab interval 7,2 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ATS 
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit 90°
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 01/12/19 20:48:18
PHOTOS: 10/03/06 17:04:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
10612 visit(s) since 28/08/03
Last visit 14/12/19

LIFT-WORLD IDs
Lift-ID: 140
Place-ID: 5

https://www.seilbahntechnik.net/en/lifts/140/datas.htm