Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Sonnenkarbahn I










General information  
Place Kaprun 
resort Lechnerberg 
Region Salzburg 
Country   
Name of lift Sonnenkarbahn I 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1997 
Commissioning date 20/11/97 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2415 m
Height of mountain station 2672 m
Vertical rise 257 m
Route distance 759 m
Horizontal length 705 m
Average incline 36,67 %
Largest incline 73,5 %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 2,5 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 396 kW
Drive power (Operation) 316 kW
Brake power -256 kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Bubble colour neutral 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 48 Stk
Cab distance 36 m
Cab interval 7,2 s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope 1575 m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ??  
Situation of entrance parallel 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/01/22
PHOTOS: ??

Lift-Statistics
17687 visit(s) since 28/08/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 140
Place-ID: 5

https://www.seilbahntechnik.net/en/lifts/140/datas.htm