Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Rendlbahn


track in summer
track in summer

valley station in summer
valley station in summer

cabin in summer
cabin in summer


Infos for handicapped persons
Sorry, no information available.

Characteristics
Second 8-MGD on the Arlberg, with seat heating at all the first!

General information  
Place St. Anton am Arlberg
resort Ski Arlberg
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Rendlbahn 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2009 
Commissioning date 18/12/09

geometric data  
Height of valley station 1309,6 m
Height of mountain station 2030,78 m
Vertical rise 721,18 m
Route distance 2588,27 m
Horizontal length 2410,17 m
Average incline 29,9 %
Largest incline 94 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1300 (2000) Pers/h
Travel time 7,23 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 5176,54 m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 860 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Sigma
Cab model DIAMOND - C16D210
Seating leather
Seat heater yes
Heater no
Aircon no
Persons per cab
Number of cabs 44 Stk
Cab distance ?? m
Cab interval 22,2 (14,4) s
Garage type ground floor
Garage place mountain station
Garage direction forward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 8 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 28/03/16 15:48:17
PHOTOS: 30/09/09 11:59:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
21487 visit(s) since 15/09/09
Last visit 18/10/19

LIFT-WORLD IDs
Lift-ID: 14057
Place-ID: 288

https://www.seilbahntechnik.net/en/lifts/14057/datas.htm