Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Stubnerkogelbahn II







Line
Line

General information  
Place Bad Gastein 
resort ?? 
Region Salzburg 
Country   
Name of lift Stubnerkogelbahn II 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2009 
Commissioning date 04/12/09 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1772 m
Height of mountain station 2222 m
Vertical rise 450 m
Route distance 1043 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2790 Pers/h
Travel time 4,2 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 636 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type A108C 
Cab manufacturer CWA 
Cab model OMEGA IV-8 LWI 
Seating leather 
Seat heater yes 
Heater no 
Aircon no 
Persons per cab
Number of cabs 56 Stk
Cab distance ?? m
Cab interval 10,3 s
Garage type ground floor 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 26/01/22
PHOTOS: ??

Lift-Statistics
23213 visit(s) since 18/09/09
Last visit 15/11/24

LIFT-WORLD IDs
Lift-ID: 14059
Place-ID: 246

https://www.seilbahntechnik.net/en/lifts/14059/datas.htm