Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Rohnenspitzbahn


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Zöblen
resort
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Rohnenspitzbahn 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 2009 
Commissioning date ??

geometric data  
Height of valley station 1076 m
Height of mountain station 1470 m
Vertical rise 394 m
Route distance 1056 m
Horizontal length 1095 m
Average incline ?? %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1890 Pers/h
Travel time 3,3 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Redaelli 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system Leitner 
Power control system Leitner 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 287 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive electrical

cabins data  
Grip type LPA-M
Cab manufacturer Leitner
Cab model ??
Seating Icolan
Seat heater yes
Persons per cab
Number of cabs 54 Stk
Cab distance ?? m
Cab interval ?? s
Garage type emergency rail
Garage place valley and mountain
Garage direction backward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/02/21 20:45:06
PHOTOS: 06/01/10 16:42:00

Lift-Statistics
8776 visit(s) since 19/09/09
Last visit 24/09/21

LIFT-WORLD IDs
Lift-ID: 14076
Place-ID: 363

https://www.seilbahntechnik.net/en/lifts/14076/datas.htm