Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Muggengratbahn












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Zuers
resort Ski Arlberg
Region Vorarlberg
Country AT Austria, Österreich
Name of lift Muggengratbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2009 
Commissioning date 19/12/09

geometric data  
Height of valley station 2149,7 m
Height of mountain station 2439,90 m
Vertical rise 290,20 m
Route distance 957,2 m
Horizontal length 912,80 m
Average incline 31,79 %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 6,10 m
Trackwidth line 6,10 m
Trackwidth return 6,10 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 2020 Pers/h
Travel time 3,29 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 2070 m
Total weight of haul rope 14 t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive 1 Stk
Drive power (Start) 394 kW
Drive power (Operation) 324 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type DT 106
Cab manufacturer Doppelmayr
Cab model 6E98/B
Bubble colour neutral
Seating leather
Seat heater yes
Persons per cab
Number of cabs 41 Stk
Cab distance 53,46 m
Cab interval 10,69 s
Garage type ground floor
Garage place valley station
Garage direction forward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5,5 months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 12/08/18 16:35:09
PHOTOS: 28/02/10 14:06:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
9106 visit(s) since 17/09/09
Last visit 19/10/19

LIFT-WORLD IDs
Lift-ID: 14077
Place-ID: 341

https://www.seilbahntechnik.net/en/lifts/14077/datas.htm