Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Arrondaz





Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Valfréjus
resort
Region Rhône-Alpes
Country FR France
Name of lift Arrondaz 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2009 
Commissioning date 08/12/09

geometric data  
Height of valley station 1533 m
Height of mountain station 2200 m
Vertical rise 667 m
Route distance 2148 m
Horizontal length 2016 m
Average incline 33,09 %
Largest incline 81,22 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 6,10 m
Trackwidth line 6,10 m
Trackwidth return 6,10 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity (2000) 2550 Pers/h
Travel time 7,0 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 51 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope 2018 kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 848 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type A108C
Cab manufacturer CWA
Cab model OMEGA IV-8 SI
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs (59) 74 Stk
Cab distance ?? m
Cab interval 11,3 s
Garage type ground floor
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs 8,800,000  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 26/06/20 18:07:37
PHOTOS: ????

Lift-Statistics
3263 visit(s) since 23/09/09
Last visit 03/12/21

LIFT-WORLD IDs
Lift-ID: 14087
Place-ID: 1238

https://www.seilbahntechnik.net/en/lifts/14087/datas.htm