Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-CLD/B Märchenwiesenbahn








Valley Station
Valley Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
yellow Bubbles

General information  
Place Schladming
resort Ski amadé
Schladming Dachstein Tauern
Region Styria, Steiermark
Country AT Austria, Österreich
Name of lift Märchenwiesenbahn 
Type 8-CLD/B 
Lift manufacturer Leitner 
Year of construction 2009 
Commissioning date ??

geometric data  
Height of valley station 1702,5 m
Height of mountain station 1908,05 m
Vertical rise 205,55 m
Route distance 720,47 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,30 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3029 Pers/h
Travel time 2,40 min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 353 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Bubble colour
Seating leather
Seat heater yes
Persons per cab
Number of cabs 39 Stk
Cab distance 48 m
Cab interval 9,6 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3 months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 28/03/16 15:46:59
PHOTOS: 06/02/10 15:30:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
17634 visit(s) since 30/09/09
Last visit 17/10/19

LIFT-WORLD IDs
Lift-ID: 14157
Place-ID: 240

https://www.seilbahntechnik.net/en/lifts/14157/datas.htm