Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-CLD/B Sonnen Bahn (Gampabing)












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place St. Gallenkirch
resort Silvretta Nova
Silvretta Montafon
Region Vorarlberg
Country AT Austria, Österreich
Name of lift Sonnen Bahn (Gampabing) 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2009 
Commissioning date ??

geometric data  
Height of valley station 1935 m
Height of mountain station 2146 m
Vertical rise 211 m
Route distance 587 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 2,25 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way 2,00 m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 463 kW
Drive power (Operation) 352 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Doppelmayr
Cab model 8E98/B
Bubble colour orange
Seating leather
Seat heater yes
Persons per cab
Number of cabs 30 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime ??
Situation of entrance 90°
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 14/03/19 20:12:34
PHOTOS: 29/12/09 19:09:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
14313 visit(s) since 01/10/09
Last visit 16/07/19

LIFT-WORLD IDs
Lift-ID: 14158
Place-ID: 46

https://www.seilbahntechnik.net/en/lifts/14158/datas.htm