Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLF Panoramabahn Gipfel


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place St. Ulrich am Pillersee
resort 3 Laender Freizeit-Arena
Buchensteinwand
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Panoramabahn Gipfel 
Type 4-CLF 
Lift manufacturer Doppelmayr 
Year of construction 2009 
Commissioning date ??

geometric data  
Height of valley station 1257 m
Height of mountain station 1453 m
Vertical rise 196 m
Route distance 618 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1769 Pers/h
Travel time ?? min
Driving speed line 2,6 m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type 4FG
Cab manufacturer Doppelmayr
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 63 Stk
Cab distance ?? m
Cab interval ?? s

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 10 months
Seasontime ??
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 18/12/18 21:52:14
PHOTOS: 23/02/10 21:53:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
6831 visit(s) since 14/10/09
Last visit 01/04/20

LIFT-WORLD IDs
Lift-ID: 14184
Place-ID: 555

https://www.seilbahntechnik.net/en/lifts/14184/datas.htm