  10-MGD Marchner

Line
Line

Line
Line

Line
Line

General information  
Place Olang / Valdaora 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Marchner 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2009 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1559 m
Height of mountain station 2010 m
Vertical rise 451 m
Route distance 1684 m
Horizontal length 1618 m
Average incline 28 %
Largest incline 58 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 (4000) Pers/h
Travel time ?? min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) 430 kW
Drive power (Operation) 760 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer ?? 
Cab model DIAMOND - C10D210 
Seating leather 
Seat heater yes 
Heater ?? 
Aircon no 
Persons per cab 10 
Number of cabs 59 (78) Stk
Cab distance 72 m
Cab interval 12 s
Garage type underground 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4,5 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29/04/23
PHOTOS: ??

Lift-Statistics
21644 visit(s) since 17/10/09
Last visit 29/03/24