Lift-Database » Lifts in the world
6-CLD/B Tschaneckbahn
February 2008
Line
Mountain Station
General information | |
---|---|
Place | Katschberghoehe |
resort | ?? |
Region | Carinthia |
Country | |
Name of lift | Tschaneckbahn |
Type | 6-CLD/B |
Lift manufacturer | Doppelmayr |
Year of construction | 2001 |
Commissioning date | 2001 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1609,7 m |
Height of mountain station | 2017,7 m |
Vertical rise | 408 m |
Route distance | 1167,6 m |
Horizontal length | ?? m |
Average incline | 37,29 % |
Largest incline | 52,30 % |
Number of pillars | 15 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 6,1 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2765 Pers/h |
Travel time | 3,99 min |
Driving speed line | 5,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | Elin |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | 1 Stk |
Drive power (Start) | 646 kW |
Drive power (Operation) | 514 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | hydrostatic |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Doppelmayr |
Cab model | ?? |
Bubble colour | neutral |
Seating | leather |
Seat heater | no |
Persons per cab | 6 |
Number of cabs | 66 Stk |
Cab distance | 39,06 m |
Cab interval | 7,81 s |
Garage type | underground |
Garage place | valley station |
Garage direction | backward |
Loading direction | forward |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 43 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | 6 months |
Seasontime | ❄ winter |
Situation of entrance | 90° |
Situation of exit | parallel |
Loading carpet | yes |
Evacuation ropeway | no |
Integrated rescue system | no |
Rope position control | yes |
Asset number (Trail map) | 4 |
Updates
Datas: 23/06/23
PHOTOS: ??
Lift-Statistics
16105 visit(s) since 12/04/03
Last visit 15/11/24
LIFT-WORLD IDs
Lift-ID: 142
Place-ID: 82
https://www.seilbahntechnik.net/en/lifts/142/datas.htm
Datas: 23/06/23
PHOTOS: ??
Lift-Statistics
16105 visit(s) since 12/04/03
Last visit 15/11/24
LIFT-WORLD IDs
Lift-ID: 142
Place-ID: 82
https://www.seilbahntechnik.net/en/lifts/142/datas.htm