Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Fluh Express












Infos for handicapped persons
Sorry, no information available.

Characteristics
automatic restraining bar, heated seats

General information  
Place Steibis
resort
Region Bavaria, Bayern
Country DE Germany, Deutschland
Name of lift Fluh Express 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2009 
Commissioning date ??

geometric data  
Height of valley station 1030 m
Height of mountain station 1360 m
Vertical rise 330 m
Route distance 1230 m
Horizontal length 1178 m
Average incline 28 %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 (3180) Pers/h
Travel time 4,7 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope 2500 m
Total weight of haul rope 27 t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way 5 m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 593 kW
Drive power (Operation) 456 kW
Brake power -526 kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Doppelmayr
Cab model 6E98/B
Bubble colour
Seating leather
Seat heater yes
Persons per cab
Number of cabs 60/ 80 Stk
Cab distance 45 / 34 m
Cab interval 9,0 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 3 months
Seasontime ??
Situation of entrance 90°
Situation of exit 90°
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 30/03/10 22:15:00
PHOTOS: 18/06/10 20:54:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
5788 visit(s) since 29/10/09
Last visit 09/12/19

LIFT-WORLD IDs
Lift-ID: 14287
Place-ID: 290

https://www.seilbahntechnik.net/en/lifts/14287/datas.htm