Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Glacier Express

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Val d'Isère 
resort Espace Killy 
Region Rhône-Alpes 
Country   
Name of lift Glacier Express 
Type 6-CLD 
Lift manufacturer Garaventa 
Year of construction 2001 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2481 m
Height of mountain station 2805 m
Vertical rise 324 m
Route distance 1780 m
Horizontal length 1744 m
Average incline 18 %
Largest incline 53 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,7 m
Trackwidth line 6,0 m
Trackwidth return 5,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 6,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 720 kW
Drive power (Operation) 490 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type AK 460 
Cab manufacturer Garaventa 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 105 Stk
Cab distance 36 m
Cab interval 7,2 s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tycsa 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 24/11/23
PHOTOS: ??

Lift-Statistics
8304 visit(s) since 01/02/03
Last visit 12/11/24

LIFT-WORLD IDs
Lift-ID: 1441
Place-ID: 1231

https://www.seilbahntechnik.net/en/lifts/1441/datas.htm