Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-MGD Pardorama (Pardatschgrat II)





Valley Station
Valley Station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Ischgl
resort

Silvretta Arena
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Pardorama (Pardatschgrat II) 
Type 4-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1990/14 
Commissioning date 12/12/90

geometric data  
Height of valley station 1889 m
Height of mountain station 2624 m
Vertical rise 735 m
Route distance 1600 m
Horizontal length ?? m
Average incline 52,00 %
Largest incline 76,70 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1750 Pers/h
Travel time 5,4 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 617 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model OMEGA 4s
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 188 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs 10,900,000  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control yes
Asset number (Trail map) F2 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/04/20 12:37:12
PHOTOS: 06/02/10 22:37:00

Lift-Statistics
12657 visit(s) since 15/01/10
Last visit 05/06/20

LIFT-WORLD IDs
Lift-ID: 14552
Place-ID: 2

https://www.seilbahntechnik.net/en/lifts/14552/datas.htm