Lift-Database » Lifts in the world
2-CLF Seetalbahn
General information | |
---|---|
Place | Spittal an der Drau |
resort | ?? |
Region | Carinthia |
Country | |
Name of lift | Seetalbahn |
Type | 2-CLF |
Lift manufacturer | De Pretis |
Year of construction | 1981 |
Commissioning date | 08/01/82 |
Date of closing down | 2011 |
Date of pull down | 2016 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
2 Bachmanncorner |
geometric data | |
---|---|
Height of valley station | 1889,0 m |
Height of mountain station | 2114,30 m |
Vertical rise | 225,30 m |
Route distance | 957,53 m |
Horizontal length | 917,45 m |
Average incline | 24,60 % |
Largest incline | 56,70 % |
Number of pillars | 12 Stk |
Greatest spanwidth | 141 m |
Max ground clearance | 17,3 m |
Trackwidth drive | 3,6 m |
Trackwidth line | 3,6 m |
Trackwidth return | 3,6 m |
Angle of wrap (drive wheel) | 180 ° |
Drive altitude of site | 2115 m |
Maximum capacity | 800 Pers/h |
Travel time | 10,0 min |
Driving speed line | 1,6 m/s |
electrical data | |
---|---|
Electrical control | AEG |
Remote control and telemonitoring system | AEG |
Power control system | AEG |
Number of drive | 1 Stk |
Drive power (Start) | 105 kW |
Drive power (Operation) | 90,4 kW |
Brake power | 56,3 kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | hydrostatic |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Girak |
Cab model | ?? |
Seating | Icolan |
Seat heater | no |
Persons per cab | 2 |
Number of cabs | 117 Stk |
Cab distance | 14,40 m |
Cab interval | 9,00 s |
rope data | |
---|---|
Rope manufacturer | Austria Draht |
Length of haul rope | 2020 m |
Total weight of haul rope | 7,5 t |
Haul rope diameter | 32 mm |
Nominal strength of haul rope | 1960 N/mm² |
Breaking strength of rope | 779 kN |
Tensionstation haulrope | Valley station |
Tension type | rope tension weight |
Tension way | 5,0 m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | 7 months |
Seasontime | ❄ ☀ all-season |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 11/02/22
PHOTOS: ??
Lift-Statistics
10782 visit(s) since 30/04/03
Last visit 18/04/24
LIFT-WORLD IDs
Lift-ID: 1470
Place-ID: 544
https://www.seilbahntechnik.net/en/lifts/1470/datas.htm
Datas: 11/02/22
PHOTOS: ??
Lift-Statistics
10782 visit(s) since 30/04/03
Last visit 18/04/24
LIFT-WORLD IDs
Lift-ID: 1470
Place-ID: 544
https://www.seilbahntechnik.net/en/lifts/1470/datas.htm