Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-MGD Mont de la Chambre 2





Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Les Menuires
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Mont de la Chambre 2 
Type 4-MGD 
Lift manufacturer Poma 
Year of construction 1970 
Commissioning date 1970
Date of closing down 2001
Date of pull down ??

geometric data  
Height of valley station 2397 m
Height of mountain station 2955 m
Vertical rise 558 m
Route distance 1450 m
Horizontal length ?? m
Average incline ?? %
Largest incline 54 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 6,45 min
Driving speed line 3,75 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 166 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer ??
Cab model ??
Seating ??
Seat heater no
Heater no
Aircon ??
Persons per cab
Number of cabs 81 Stk
Cab distance 45 m
Cab interval 12 s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 30/12/16 18:31:27
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
2411 visit(s) since 07/04/10
Last visit 21/09/19

LIFT-WORLD IDs
Lift-ID: 14701
Place-ID: 1109

https://www.seilbahntechnik.net/en/lifts/14701/datas.htm