Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


2-CLF Planai West I


Downstream to tunnel (2005)
Downstream to tunnel (2005)

Through the valley (2005)
Through the valley (2005)

Before the tunnel (2005)
Before the tunnel (2005)


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Schladming
resort Ski amadé
Schladming Dachstein Tauern
Region Styria, Steiermark
Country AT Austria, Österreich
Name of lift Planai West I 
Type 2-CLF 
Lift manufacturer Girak 
Year of construction 1979 
Commissioning date ??
Date of closing down 2006
Date of pull down ??

geometric data  
Height of valley station 745 m
Height of mountain station 930 m
Vertical rise 185 m
Route distance 1083 m
Horizontal length ?? m
Average incline 17,80 %
Largest incline 88,40 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1100 Pers/h
Travel time 7,37 min
Driving speed line 2,4 m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 118 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer ??
Cab model ??
Seating none
Seat heater no
Persons per cab
Number of cabs 140 Stk
Cab distance ?? m
Cab interval ?? s

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Loading carpet ??
Evacuation ropeway ??
Integrated rescue system ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 17/10/16 21:46:26
PHOTOS: 03/01/14 21:09:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11069 visit(s) since 18/01/03
Last visit 12/12/19

LIFT-WORLD IDs
Lift-ID: 1485
Place-ID: 240

https://www.seilbahntechnik.net/en/lifts/1485/datas.htm