Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Schönberg 6er-Schaukel

The mountain station
The mountain station

General information  
Place Oberwoelz 
resort Lachtal 
Region Styria 
Country   
Name of lift Schönberg 6er-Schaukel 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2010 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1657,7 m
Height of mountain station 1943,70 m
Vertical rise 286 m
Route distance 1008,41 m
Horizontal length 967 m
Average incline 29,58 %
Largest incline ?? %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2028 Pers/h
Travel time 3,47 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 380 kW
Drive power (Operation) 298 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour neutral 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 41 Stk
Cab distance 53,25 m
Cab interval 10,65 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 5 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Jun 23, 2023
PHOTOS: ??

Lift-Statistics
8448 visit(s) since Oct 17, 2010
Last visit May 10, 2025

LIFT-WORLD IDs
Lift-ID: 14923
Place-ID: 2790

https://www.seilbahntechnik.net/en/lifts/14923/datas.htm