Lift-Database » Lifts in the world
8-MGD Gaislachkoglbahn I
Valley Station
Valley Station by night
Line
General information | |
---|---|
Place | Soelden |
resort | ?? |
Region | Tyrol |
Country | |
Name of lift | Gaislachkoglbahn I |
Type | 8-MGD |
Lift manufacturer | Doppelmayr |
Year of construction | 2010 |
Commissioning date | 12 / 2010 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Highest capacity 8-seater gondola. Grip force is checked at the top station. Bottom station length: UNI-G XXL Top station length: UNI-G XXL Sheave types: 420C (compression, combo) and 501C (support) Automatic garage. |
geometric data | |
---|---|
Height of valley station | 1363 m |
Height of mountain station | 2174 m |
Vertical rise | 811 m |
Route distance | 2040,48 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | 16 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | 5,20 m |
Trackwidth line | 5,20 m |
Trackwidth return | 5,20 m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 3600 Pers/h |
Travel time | 6,7 min |
Driving speed line | 6,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | Doppelmayr |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | 2 Stk |
Drive power (Start) | 1260 kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | DT 108 |
Cab manufacturer | CWA |
Cab model | OMEGA IV-8 LWI |
Seating | leather |
Seat heater | no |
Heater | no |
Aircon | no |
Persons per cab | 8 |
Number of cabs | 107 Stk |
Cab distance | 48 m |
Cab interval | 8,0 s |
Garage type | ground floor |
Garage place | valley station |
Garage direction | forward |
Loading direction | forward |
rope data | |
---|---|
Rope manufacturer | Fatzer |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 56 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 7,5 months |
Seasontime | ❄ ☀ all-season |
Evacuation ropeway | no |
Integrated rescue system | no |
Rope position control | yes |
Asset number (Trail map) | A 10 |
Updates
Datas: 23/03/24
PHOTOS: ??
Lift-Statistics
30701 visit(s) since 23/10/10
Last visit 16/11/24
LIFT-WORLD IDs
Lift-ID: 14925
Place-ID: 1
https://www.seilbahntechnik.net/en/lifts/14925/datas.htm
Datas: 23/03/24
PHOTOS: ??
Lift-Statistics
30701 visit(s) since 23/10/10
Last visit 16/11/24
LIFT-WORLD IDs
Lift-ID: 14925
Place-ID: 1
https://www.seilbahntechnik.net/en/lifts/14925/datas.htm