Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Hochmaisbahn

Valley Station
Valley Station

Chair
Chair

Line
Line

General information  
Place Maria Alm 
resort ?? 
Region Salzburg 
Country   
Name of lift Hochmaisbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2010 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 985 m
Height of mountain station 1634 m
Vertical rise 645 m
Route distance 2081 m
Horizontal length 1967 m
Average incline ?? %
Largest incline ?? %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return 6,1 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2080 Pers/h
Travel time 7,5 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system Siemens 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 605 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model CS10 
Bubble colour orange 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 86 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 33 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) 13 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/12/22
PHOTOS: ??

Lift-Statistics
25889 visit(s) since 23/10/10
Last visit 15/11/24

LIFT-WORLD IDs
Lift-ID: 14933
Place-ID: 234

https://www.seilbahntechnik.net/en/lifts/14933/datas.htm