Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Mittersteinbahn

Line
Line

Middle Station
Middle Station

Mountain Station
Mountain Station

General information  
Place Bad Mitterndorf 
resort Tauplitz 
Region Styria 
Country   
Name of lift Mittersteinbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2010 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Middle-Station

geometric data  
Height of valley station 1207,1 m
Height of middle station(s) 1675,50 m
Height of mountain station 1913,60 m
Vertical rise 706,5 m
Route distance 2380,81 m
Horizontal length 2271 m
Average incline ?? %
Largest incline ?? %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2380 Pers/h
Travel time 6,9 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 1148 kW
Drive power (Operation) 964 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Middle station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Carvatech 
Cab model ULTRA 8 S 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 80 Stk
Cab distance 72,68 m
Cab interval 12,11 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/01/24
PHOTOS: ??

Lift-Statistics
15050 visit(s) since 24/10/10
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 14948
Place-ID: 372

https://www.seilbahntechnik.net/en/lifts/14948/datas.htm