Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Bettmeralp-Schene Bodu-Blausee












Infos for handicapped persons
Sorry, no information available.

Characteristics
Middlestation

General information  
Place Bettmeralp
resort
Region Valais
Country CH Switzerland, Confoederatio Helvetica
Name of lift Bettmeralp-Schene Bodu-Blausee 
Type 4-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2010 
Commissioning date ??

geometric data  
Height of valley station 1937 m
Height of middle station(s) 2072 m
Height of mountain station 2211 m
Vertical rise 274 m
Route distance 1079 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 4,2 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 311 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Middle station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Garaventa
Cab model ??
Bubble colour
Seating leather
Seat heater no
Persons per cab
Number of cabs 69 Stk
Cab distance ?? m
Cab interval 7,2 s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance 90°
Situation of exit parallel
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 21/06/11 20:22:00
PHOTOS: 05/04/13 16:35:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
5003 visit(s) since 26/10/10
Last visit 19/10/19

LIFT-WORLD IDs
Lift-ID: 14951
Place-ID: 2009

https://www.seilbahntechnik.net/en/lifts/14951/datas.htm