Place Bramberg am Wildkogel
resort Wildkogel

Region Salzburg
Country AT Austria, Österreich
Name of lift Smaragd II 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2010 
Commissioning date 2010

geometric data  
Height of valley station 1624 m
Height of mountain station 2101 m
Vertical rise 477 m
Route distance 1487 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 4,3 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 520 kW
Drive power (Operation) 446 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Sigma
Cab model ??
Seating ??
Seat heater ??
Heater ??
Aircon ??
Persons per cab
Number of cabs 42 Stk
Cab distance 86,4 m
Cab interval 14,4 s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 03/03/20 20:57:29
PHOTOS: 14/01/19 18:14:30

Lift-Statistics
8108 visit(s) since 27/10/10
Last visit 22/10/20

LIFT-WORLD IDs
Lift-ID: 14953
Place-ID: 383

https://www.seilbahntechnik.net/en/lifts/14953/datas.htm