Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Cry d'Er - Bellalui

Valley Station
Valley Station

Moutain Station
Moutain Station




General information  
Place Montana 
resort Crans Montana - Aminona 
Region Valais 
Country   
Name of lift Cry d'Er - Bellalui 
Type 4-CLD 
Lift manufacturer BMF 
Year of construction 2010 
Commissioning date 14 jan 2011 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2168 m
Height of middle station(s) 2528 m
Height of mountain station 360 m
Vertical rise 360 m
Route distance 1513 m
Horizontal length 1457 m
Average incline 18 %
Largest incline 51,7 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,0 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Frey 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 600 kW
Drive power (Operation) 500 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 83 Stk
Cab distance 39,82 m
Cab interval 7,96 s
Garage type emergency rail 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25 apr 2025
PHOTOS: ??

Lift-Statistics
11494 visit(s) since 27 okt 2010
Last visit 12 jul 2025

LIFT-WORLD IDs
Lift-ID: 14955
Place-ID: 2114

https://www.seilbahntechnik.net/en/lifts/14955/datas.htm