Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Berwanger Sonnalmbahn










General information  
Place Berwang 
resort Berwang/​Bichlbach/​Rinnen 
Region Tyrol 
Country   
Name of lift Berwanger Sonnalmbahn 
Type 4-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1993 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1304 m
Height of middle station(s) ?? m
Height of mountain station 1611 m
Vertical rise 307 m
Route distance 1200 m
Horizontal length ?? m
Average incline 27,08 %
Largest incline 63,42 %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 4,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 370 kW
Drive power (Operation) 304 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DS 104 
Cab manufacturer ?? 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 88 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/03/24
PHOTOS: ??

Lift-Statistics
19131 visit(s) since 16/06/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 1515
Place-ID: 375

https://www.seilbahntechnik.net/en/lifts/1515/datas.htm