Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Menuires


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Les Menuires
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Menuires 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2001 
Commissioning date 2001

geometric data  
Height of valley station 1818 m
Height of mountain station 2087 m
Vertical rise 269 m
Route distance 1108 m
Horizontal length 1075 m
Average incline 25 %
Largest incline 58 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,0 m
Trackwidth line 5,7 m
Trackwidth return 4,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 4000 Pers/h
Travel time 3,8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 820 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type Omega T
Cab manufacturer Poma
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 90 Stk
Cab distance 27 m
Cab interval 5,4 s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance Double Loading System
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 30/12/16 18:30:24
PHOTOS: 10/09/05 17:58:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
4084 visit(s) since 07/11/03
Last visit 21/09/19

LIFT-WORLD IDs
Lift-ID: 152
Place-ID: 1109

https://www.seilbahntechnik.net/en/lifts/152/datas.htm