Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Randolis - Munt da San Murezzan












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place St. Moritz
resort
Region Grisons
Country CH Switzerland, Confoederatio Helvetica
Name of lift Randolis - Munt da San Murezzan 
Type 4-CLD/B 
Lift manufacturer Leitner 
Year of construction 1994 
Commissioning date ??

geometric data  
Height of valley station 2193 m
Height of mountain station 2692 m
Vertical rise 499 m
Route distance 1713,49 m
Horizontal length 1627,20 m
Average incline 29,12 %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,30 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 6,35 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 3690 m
Total weight of haul rope ?? t
Haul rope diameter 42 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way 3,0 m

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 596 kW
Drive power (Operation) 413 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Bubble colour
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 85 Stk
Cab distance 43,20 m
Cab interval 9,6 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit 90°
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/04/09 21:08:00
PHOTOS: 08/02/10 18:30:00

Lift-Statistics
7834 visit(s) since 19/02/05
Last visit 25/09/21

LIFT-WORLD IDs
Lift-ID: 1538
Place-ID: 1726

https://www.seilbahntechnik.net/en/lifts/1538/datas.htm