Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Angertalbahn


Valley station
Valley station

Pillar
Pillar

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Bad Hofgastein
resort Ski amadé
Region Salzburg
Country AT Austria, Österreich
Name of lift Angertalbahn 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2002 
Commissioning date ??

geometric data  
Height of valley station 1175 m
Height of mountain station 1886 m
Vertical rise 711 m
Route distance 1664 m
Horizontal length ?? m
Average incline 47,0 %
Largest incline 85,7 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control STG 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 705 kW
Drive power (Operation) 562 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type A106
Cab manufacturer Doppelmayr
Cab model 4E98/B
Bubble colour
Seating ??
Seat heater no
Persons per cab
Number of cabs 99 Stk
Cab distance 36,0 m
Cab interval 7,2 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 25/05/09 18:12:00
PHOTOS: 31/12/03 17:39:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
14098 visit(s) since 21/04/03
Last visit 17/10/19

LIFT-WORLD IDs
Lift-ID: 1539
Place-ID: 245

https://www.seilbahntechnik.net/en/lifts/1539/datas.htm