Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Grasjochbahn


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
The mountain station is a massive building in which the 8-MGDs Grasjochbahn and Hochalpilabahn are integrated.

General information  
Place St. Gallenkirch
resort Silvretta Nova
Silvretta Montafon
Region Vorarlberg
Country AT Austria, Österreich
Name of lift Grasjochbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2011 
Commissioning date ??

geometric data  
Height of valley station 820,01 m
Height of mountain station 1979,51 m
Vertical rise 1159,50 m
Route distance 3915,91 m
Horizontal length 3675,65 m
Average incline ?? %
Largest incline ?? %
Number of pillars 23 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1900 (2400) Pers/h
Travel time 11,9 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 7904,59 m
Total weight of haul rope ?? t
Haul rope diameter 58 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model OMEGA IV-8 LWI
Seating leather
Seat heater yes
Heater ??
Aircon ??
Persons per cab
Number of cabs 95 (120) Stk
Cab distance 96 (73) m
Cab interval 16 (12,2) s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 7 months
Seasontime winter
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 18/12/18 21:51:50
PHOTOS: 07/04/12 10:39:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
13963 visit(s) since 03/12/11
Last visit 16/09/19

LIFT-WORLD IDs
Lift-ID: 15511
Place-ID: 46

https://www.seilbahntechnik.net/en/lifts/15511/datas.htm