Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Bamby


Line
Line

Line
Line

Valley Station
Valley Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place La Villa
resort
Dolomiti Superski
Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Bamby 
Type 6-CLD 
Lift manufacturer Leitner 
Year of construction 2011 
Commissioning date ??

geometric data  
Height of valley station 1787 m
Height of mountain station 2077 m
Vertical rise 290 m
Route distance 774 m
Horizontal length 713 m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time ?? min
Driving speed line 4 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 435 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA-M
Cab manufacturer Leitner
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 46 Stk
Cab distance 38,57 m
Cab interval 9,82 s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime ??
Situation of entrance 90°
Situation of exit parallel
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 08/11/15 21:06:04
PHOTOS: 12/03/12 22:15:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
7967 visit(s) since 02/12/11
Last visit 13/10/19

LIFT-WORLD IDs
Lift-ID: 15525
Place-ID: 1435

https://www.seilbahntechnik.net/en/lifts/15525/datas.htm