Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


2-CLF Averau


Valley Station
Valley Station

Mountain Station
Mountain Station

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-hand Lift from Arabba (former Cherz I)

General information  
Place Cortina d'Ampezzo
resort Dolomiti Superski

Region Veneto
Country IT Italy, Italia
Name of lift Averau 
Type 2-CLF 
Lift manufacturer Leitner 
Year of construction 2011 
Commissioning date ??

geometric data  
Height of valley station 2178,9 m
Height of middle station(s) ?? m
Height of mountain station 2420,9 m
Vertical rise 242 m
Route distance 988 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1196 Pers/h
Travel time 5,85 min
Driving speed line 2,80 m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer ??
Cab model ??
Seating ??
Seat heater no
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Loading carpet ??
Evacuation ropeway ??
Integrated rescue system ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 22/02/16 17:44:22
PHOTOS: 16/05/12 08:20:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
6909 visit(s) since 04/12/11
Last visit 16/10/19

LIFT-WORLD IDs
Lift-ID: 15536
Place-ID: 1382

https://www.seilbahntechnik.net/en/lifts/15536/datas.htm