Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Strussing

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Werfenweng 
resort ?? 
Region Salzburg 
Country   
Name of lift Strussing 
Type 4-CLF 
Lift manufacturer De Pretis 
Year of construction 2011 
Commissioning date ?? 
Second-hand lift. Formerly lift no. 3197 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-hand Lift from Simonhöhe (former Hirschkogel)

geometric data  
Height of valley station 1486,5 m
Height of mountain station 1829 m
Vertical rise 321 m
Route distance 851 m
Horizontal length 780 m
Average incline 41,2 %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1850 Pers/h
Travel time 5,46 min
Driving speed line 2,6 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 230 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 84 Stk
Cab distance 20,42 m
Cab interval 5,46 s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 34 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/04/23
PHOTOS: ??

Lift-Statistics
10196 visit(s) since 04/12/11
Last visit 04/12/24

LIFT-WORLD IDs
Lift-ID: 15547
Place-ID: 32

https://www.seilbahntechnik.net/en/lifts/15547/datas.htm