Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Hahnenkammbahn


Line
Line

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Kitzbuehel
resort Kitzbuehel
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Hahnenkammbahn 
Type 6-MGD 
Lift manufacturer Girak-Garaventa 
Year of construction 1996/11 
Commissioning date 1996

geometric data  
Height of valley station 786 m
Height of mountain station 1662 m
Vertical rise 878 m
Route distance 2413 m
Horizontal length ?? m
Average incline 40 %
Largest incline 88 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 7,8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 1142 kW
Drive power (Operation) 930 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type Nockenklemme Typ B
Cab manufacturer CWA
Cab model ??
Seating leather
Seat heater yes
Heater ??
Aircon ??
Persons per cab
Number of cabs 98 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 21/02/17 21:34:48
PHOTOS: 09/12/06 09:46:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
23937 visit(s) since 26/11/02
Last visit 05/12/19

LIFT-WORLD IDs
Lift-ID: 1564
Place-ID: 51

https://www.seilbahntechnik.net/en/lifts/1564/datas.htm