Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-MGD Ochsengartenbahn


Mountain station
Mountain station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Oetz
resort Hochoetz
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Ochsengartenbahn 
Type 4-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1999 
Commissioning date 1999
Date of closing down 09/04/16
Date of pull down 2016

geometric data  
Height of valley station 1507 m
Height of mountain station 2022 m
Vertical rise 511 m
Route distance 1707 m
Horizontal length ?? m
Average incline 31,80 %
Largest incline 92,20 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 1420 Pers/h
Travel time 6,3 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Austria Draht 
Length of haul rope 3500 m
Total weight of haul rope 28 t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 660 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type VR102
Cab manufacturer CWA
Cab model DELUXE 4
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 89 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley and mountain
Garage direction forward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4,5 months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 23/04/17 14:30:49
PHOTOS: 01/01/04 19:00:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
18391 visit(s) since 07/12/02
Last visit 22/10/19

LIFT-WORLD IDs
Lift-ID: 1571
Place-ID: 14

https://www.seilbahntechnik.net/en/lifts/1571/datas.htm