Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


3-CLF Kühtailelift


Mountain station
Mountain station

Mountain station
Mountain station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-hand Lift from Sölden (former Langegg I)

General information  
Place Oetz
resort Hochoetz
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Kühtailelift 
Type 3-CLF 
Lift manufacturer Doppelmayr 
Year of construction 2001 
Commissioning date ??

geometric data  
Height of valley station 1840 m
Height of mountain station 2071 m
Vertical rise 231 m
Route distance 726 m
Horizontal length ?? m
Average incline 33,72 %
Largest incline 44,58 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1965 Pers/h
Travel time 5,5 min
Driving speed line 2,2 m/s

rope data  
Rope manufacturer Austria Draht 
Length of haul rope 1452 m
Total weight of haul rope 7,8 t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system Elin 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 265 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type gas engine
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model ??
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 122 Stk
Cab distance ?? m
Cab interval ?? s

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3,5 months
Seasontime winter
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 28/03/16 15:22:10
PHOTOS: 01/01/04 18:46:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
9561 visit(s) since 30/12/02
Last visit 16/09/19

LIFT-WORLD IDs
Lift-ID: 1572
Place-ID: 14

https://www.seilbahntechnik.net/en/lifts/1572/datas.htm