Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Brunnenkopfbahn


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Oetz
resort Hochoetz
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Brunnenkopfbahn 
Type 4-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date ??

geometric data  
Height of valley station 1960 m
Height of mountain station 2174 m
Vertical rise 214 m
Route distance 658 m
Horizontal length ?? m
Average incline 35 %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2320 Pers/h
Travel time 2,19 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope 1400 m
Total weight of haul rope 6,4 t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system Elin 
Number of drive 1 Stk
Drive power (Start) 315 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 104G
Cab manufacturer Doppelmayr
Cab model ??
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 48 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3 months
Seasontime winter
Situation of entrance 90°
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 25/12/15 15:14:51
PHOTOS: 23/03/04 21:30:44

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
9262 visit(s) since 16/03/03
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 1575
Place-ID: 14

https://www.seilbahntechnik.net/en/lifts/1575/datas.htm