Lift-Database » Lifts in the world
2-CLF Acherkogelbahn Sektion II

Valley station

Line

Moutain station
General information | |
---|---|
Place | Oetz |
resort | Hochoetz |
Region | Tyrol |
Country | ![]() |
Name of lift | Acherkogelbahn Sektion II |
Type | 2-CLF |
Lift manufacturer | Doppelmayr |
Year of construction | 1975 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1410 m |
Height of mountain station | 2023 m |
Vertical rise | 613 m |
Route distance | 1432 m |
Horizontal length | ?? m |
Average incline | 48,10 % |
Largest incline | 82,30 % |
Number of pillars | 15 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 884 Pers/h |
Travel time | 9,4 min |
Driving speed line | 2,5 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | 1 Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 250 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | diesel engine |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | 2FG |
Cab manufacturer | Doppelmayr |
Cab model | ?? |
Seating | ?? |
Seat heater | no |
Persons per cab | 2 |
Number of cabs | 140 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | 2871 m |
Total weight of haul rope | 13,9 t |
Haul rope diameter | 36 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | 9 months |
Seasontime | ❄ winter |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 19 gen 2024
PHOTOS: ??
Lift-Statistics
16594 visit(s) since 1 giu 2003
Last visit 16 apr 2025
LIFT-WORLD IDs
Lift-ID: 1576
Place-ID: 14
https://www.seilbahntechnik.net/en/lifts/1576/datas.htm
Datas: 19 gen 2024
PHOTOS: ??
Lift-Statistics
16594 visit(s) since 1 giu 2003
Last visit 16 apr 2025
LIFT-WORLD IDs
Lift-ID: 1576
Place-ID: 14
https://www.seilbahntechnik.net/en/lifts/1576/datas.htm