Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Saulire Express 1












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Meribel
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Saulire Express 1 
Type 8-MGD 
Lift manufacturer Poma 
Year of construction 2012 
Commissioning date 2012

geometric data  
Height of valley station 1445 m
Height of mountain station 2077 m
Vertical rise 632 m
Route distance 1748 m
Horizontal length 1652 m
Average incline 38 %
Largest incline 78 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 4,87 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 2 Stk
Drive power (Start) 1000 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type LPA
Cab manufacturer Sigma
Cab model DIAMOND - C8S210
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 68 Stk
Cab distance 61,8 m
Cab interval 10,3 s
Garage type underground
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 04/01/17 17:07:39
PHOTOS: 25/04/15 18:08:41

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
5809 visit(s) since 28/10/12
Last visit 14/09/19

LIFT-WORLD IDs
Lift-ID: 16006
Place-ID: 1130

https://www.seilbahntechnik.net/en/lifts/16006/datas.htm