Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-CLD/B Rotadl


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Neustift im Stubaital
resort White 5

Stubaier Gletscher
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Rotadl 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2012 
Commissioning date 2012

geometric data  
Height of valley station 2627 m
Height of mountain station 3011 m
Vertical rise 384 m
Route distance 1354,88 m
Horizontal length 1280,7 m
Average incline ?? %
Largest incline ?? %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,30 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 (3400) Pers/h
Travel time 4,5 min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Doppelmayr
Cab model 8E98/B
Bubble colour neutral
Seating leather
Seat heater yes
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period 4 months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet yes
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 30/05/20 11:47:11
PHOTOS: 17/08/13 21:00:00

Lift-Statistics
19103 visit(s) since 31/10/12
Last visit 25/10/20

LIFT-WORLD IDs
Lift-ID: 16029
Place-ID: 87

https://www.seilbahntechnik.net/en/lifts/16029/datas.htm