Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Schneewittchenhang












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Winterberg
resort
Region North Rhine-Westphalia, Nordrhein-Westfalen
Country DE Germany, Deutschland
Name of lift Schneewittchenhang 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2012 
Commissioning date ??

geometric data  
Height of valley station 701 m
Height of middle station(s) ?? m
Height of mountain station 813 m
Vertical rise 112 m
Route distance 820 m
Horizontal length 813 m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 3,2 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type A104C
Cab manufacturer Doppelmayr
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 52 Stk
Cab distance 36 m
Cab interval 7,2 s
Garage type station circulation
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 28/08/15 22:07:00
PHOTOS: 03/02/13 19:51:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
7104 visit(s) since 31/10/12
Last visit 19/10/19

LIFT-WORLD IDs
Lift-ID: 16037
Place-ID: 1985

https://www.seilbahntechnik.net/en/lifts/16037/datas.htm