Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Bochasses - Derrière Pertuys





Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Troistorrents
resort Morgins
Portes du Soleil
Region Valais
Country CH Switzerland, Confoederatio Helvetica
Name of lift Bochasses - Derrière Pertuys 
Type 6-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2012 
Commissioning date 2012

geometric data  
Height of valley station ?? m
Height of middle station(s) ?? m
Height of mountain station ?? m
Vertical rise 379 m
Route distance 1667 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type none
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Garaventa
Cab model ??
Bubble colour
Seating ??
Seat heater no
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance ??
Situation of exit ??
Loading carpet ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 30/01/18 20:58:53
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
2769 visit(s) since 03/11/12
Last visit 13/10/19

LIFT-WORLD IDs
Lift-ID: 16086
Place-ID: 2345

https://www.seilbahntechnik.net/en/lifts/16086/datas.htm