Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Plan de Mains





Valley station
Valley station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Méribel-Mottaret
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Plan de Mains 
Type 6-CLD 
Lift manufacturer Leitner 
Year of construction 2002 
Commissioning date 2002

geometric data  
Height of valley station 2115 m
Height of mountain station 2405 m
Vertical rise 290 m
Route distance 821 m
Horizontal length ?? m
Average incline 38 %
Largest incline 69 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 2,73 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 630 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 51 Stk
Cab distance 40 m
Cab interval 8 s
Garage type emergency rail
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 33 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 05/01/17 21:16:17
PHOTOS: 29/12/05 18:15:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
4468 visit(s) since 15/06/03
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 162
Place-ID: 1131

https://www.seilbahntechnik.net/en/lifts/162/datas.htm