Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Gletscher Jet

Mountain Station
Mountain Station

Mountain Station
Mountain Station

Line
Line

General information  
Place Innerfragant 
resort Skihit 
Region Carinthia 
Country   
Name of lift Gletscher Jet 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2000 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2716,3 m
Height of middle station(s) ?? m
Height of mountain station 3088,60 m
Vertical rise 372,25 m
Route distance 1075,2 m
Horizontal length ?? m
Average incline 36,70 %
Largest incline 40,00 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 3,6 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control STG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 556 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 65 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 3 months
Seasontime ❄ ☀ all-season 
Situation of entrance ?? 
Situation of exit ?? 
Loading carpet ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/12/23
PHOTOS: ??

Lift-Statistics
18766 visit(s) since 11/12/02
Last visit 15/11/24

LIFT-WORLD IDs
Lift-ID: 163
Place-ID: 446

https://www.seilbahntechnik.net/en/lifts/163/datas.htm